CURRENT PROJECTSNew Heat Solutions

Ledborough Gate, Beaconsfield

Date: 2021

Developer: Palatine Homes

Project Size: 3 Residential Unit

This project starts in September 2021. The 3 units are of a high specification with UFH to ground and first floors. Vaillant system boiler and 300ltrs of hot water storage.

Smitham Bottom Lane, Purley, Surrey

Date: 2021

Developer: Kempton Homes

Project Size: 9 Apartments

Another amazing development from Kempton Homes. We started on site in April 2021, a very similar to Riddlesdown Road in so much that it is 9 apartments all being heated with UFH by way of a combination boiler. A gas service to each apartment using CSST pipe from GFS Flex.

South Place, Surbiton

Date: 2021

Developer: DCB (Kent) Ltd

Project Size: 49 Apartments

49 Housing association apartments being built for Richmond Housing Project (RHP). Each unit has a gas fired boiler to radiators, with LST radiators on the ground floor. The development also has a 9,000ltr cold water booster tank a 3 booster pumps. Gas is distributed to each apartment using a CSST ‘pipe within pipe’ system.

Somerville House, Twickenham

Date: 2021

Developer: DCB (Kent) Ltd

Project Size: 25 Residential Units

25 Housing association apartments being built for Richmond Housing Project (RHP). This development is being built using BIM (Building Information Modelling) and requires a high level of accuracy. Each unit has a gas fired boiler to LST radiators throughout. The scheme has a 2,000ltr cold water booster tank and 3 booster pumps.

Downs Road, Epsom

Date: 2021

Developer: OCB Construction

Project Size: 1 Residential Unit

A single dwelling for a developer that we have worked for many times in the past. UFH is installed to the ground floor with radiators to the first floor. Heating and hot water is supplied by way of a Vaillant aroTHERM plus 12kW with a 250ltr hot water cylinder.

Burleigh Lane, Ascot

Date: 2021

Developer: Brookworth Homes

Project Size: 1 Residential Unit

This 6,500 sqft house is of the highest specification. Fully air conditioned, with UFH on all 3 floors. Hot water and heating is from a bivalent system which comprises of 2 number 12kW Vaillant aroTHERM ASHP’s with a 48Kw Vaillant boiler as back up and a 500ltr high gain hot water cylinder.